Limestone Greenway

  • Trailhead at Church Lane
  • Suite 100
  • Bloomington, IN 47404
  • (812) 349-2800

A 1.7-mile asphalt-paved trail that connects the Clear Creek Trail to S. Victor Pike. Visitors can access the trail at the Church Lane Trailhead, 0.2 miles west of S. Rogers Street. The Limestone Greenway connects to two other rail-trails: the Clear Creek Trail and the Bloomington Rail Trail (which turns into the B-Line Trail).